MKA Home Page

Totally Awesome House Project Home

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

FloorsFloorsFloors!

Roofing

Siding

Drywall

Tile

Cabinets & Stuff

More framing of the East Wing. The main level overhangs the foundation walls by 18" on the north and east sides. The window in the concrete below looks into the bathroom and the little blockout in the lower right is for the furnace exhaust.