MKA Home Page

Totally Awesome House Project Home

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

FloorsFloorsFloors!

Roofing

Siding

Drywall

Tile

Cabinets & Stuff

There's Mike running the hose on the wall between the entrance and the Kitchen. Just left of the hose is the north wall with the single steel column sticking out the top. This photo is from the west side of the house.