MKA Home Page

Totally Awesome House Project Home

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

FloorsFloorsFloors!

Roofing

Siding

Drywall

Tile

Cabinets & Stuff

After the concrete trucks and the pump had left, they started slick troweling the slab. In between the pour and the troweling, these guys got to take a break and get a bite to eat. I think they waited about 90 minutes to start slicking.