MKA Home Page

Totally Awesome House Project Home

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

FloorsFloorsFloors!

Roofing

Siding

Drywall

Tile

Cabinets & Stuff

On a warm Saturday in April, we discovered that Allstate Blasting had drilled holes around our rock. About 25 holes, 3" in diameter, had been placed around the rock. You can see the lighter areas, which is the dust from the granite. The orange vertical line just left of center will be the west wall of the stair going up to the main level.